Tuesday, October 13, 2026 · Petrol Rs 395.37 · USD/PKR 277.05 · Gold Rs 439936/tola
Breaking
The Lahore Canal We Deserve: Turning a Familiar Waterway into a Living Solution for the City’s Environmental Crisis KSE-100 Sheds 1,965 Points as KP Emergency Rattles Investors Ousted KP Chief Minister Taken Into Preventive Custody Who Runs Khyber Pakhtunkhwa Now: Governor, Council and Secretariat Four Young Men Killed by Landmine Near the Line of Control UNDP Says 38.3% of Pakistanis Face Multidimensional Poverty Apex Committee Meets Under Governor’s Rule, Vows Continued Operations OIC Condemns Houthi Attacks on Saudi Arabia, Reaffirms Support for Kingdom’s Security Iran Says It Struck a Tanker in the Strait of Hormuz Omani Foreign Minister Arrives for Joint Commission Talks Houthi Official Warns US of ‘Swift and Painful Response’ Over Possible Yemen Intervention Shehbaz Forms Dar-Led Committee to Oversee Khyber Pakhtunkhwa Affairs Five Killed, Dozens Injured as Rehman Baba Express Derails Near Multan IMF Warns AI Could Disrupt 60% of Jobs in Advanced Economies, Calls for Rethinking Tax Policies Five Killed as Rehman Baba Express Derails Near Multan Two Army Pilots Killed as Training Aircraft Crashes in Quetta IMF Raises Pakistan’s Inflation Forecast to 9.9 Percent Diesel Is Dearer Than Petrol Again as Prices Cross Back Dar Says There Was No Option Left but Emergency in KP Gold Falls Rs2,100 a Tola as Bullion Slips $21 an Ounce

Articles for tag: 4, 500 MW power generation, Basha, construction progress, Dam, Dasu hydropower project, Diamer, Diamer Basha dam, Diamer elders Jirga, fund barriers, Indus River, infrastructure development, irrigation capacity, local employment, materials testing laboratory, permanent bridge, progress, Project completion 2028, RCC dam, resettlement measures, reviewed, river diversion system, Upper Kohistan, WAPDA Chairman Sajjad Ghani, WAPDA Confidence Building Measures., water storage capacity

September 6, 2024

News Desk

Diamer Basha dam progress reviewed

LAHORE: WAPDA Chairman Engr Lt Gen Sajjad Ghani (Retd) reviewed the construction progress of Diamer Basha Dam project during a day-long visit, according to a press release issued on Thursday. Diamer Basha Dam, at 272 meters high, is the tallest prestressed concrete (RCC) dam in the world. It is being built along the Indus River, 40 km downstream of the town of Chilas. Construction is currently underway at 17 key locations, with the project scheduled for completion in 2028, the statement said. Ghani inspected the diversion tunnels, upstream and downstream dams, retaining wall, dam shaft and the recently completed permanent

Hamza Azhar SalamEditor — Hamza Azhar Salam · Write to us with suggestions or tips
Powered by: Frontpage.dev
WP Twitter Auto Publish Powered By : XYZScripts.com