Islamabad:
The Multan Electric Power Company (MEPCO) has carried out a financial loss of RS41.8 billion due to poor account recovery and higher line losses.
The shocking revelation was made during a public hearing on the proposed five-year MEPCO investment plan of 119 billion Rs and covering the financial uses of 2025-26 to 2029-30. The hearing was held at the headquarters of Nepra, where the meeting was chaired by the President of the Energy Regulatory Authority.
The investment plan of the RS119 billion Rs of Public Energy came for criticism, as the company failed to achieve the previous goal of utilizing the Fund. Mepco described plans to fund 83% of the proposed projects through internal resources and 13% through debt.
During the hearing, the company gave details of its financial performance, the position of free cash flow and the challenges for achieving previous goals.
Nepra emphasized that Mepco used only 60% of its previous investment program, remaining the goals of reducing transmission and distribution (T&D).
Instead of limiting T&D’s losses to 11.83%, MEPCO losses recorded 15.18%, which led to a financial hit of $ 22.6 billion. In addition, the recovery index for the financial year 2024 reported at 97.2%, causing a loss of RS19.2 billion.
The regulator expressed concern about MEPCO’s technical challenges, including low voltage losses in the 132-Kilovolt grid and 11KV feeders.
According to data presented during the hearing, Nepra said eight transport lines and 12 power transformers in areas such as Arifwala, Sahiwal, DG Khan, Rahim Yar Khan, Vehari and Khanewal. In addition, 202 feeders reported as overloaded, with 102 feeders suffering from losses of over 15%.
Nepra expressed its reservations about MEPCO’s ability to execute the proposed investment plan, taking into account delays in previous projects, such as upgrades to the transfer network, which have led to a negative impact on costs to consumers.
As the demand for electricity had declined, Nepra questioned the need for investment of 119 billion Rs and called on Mepco’s CEO to streamline the plan priority in consumer relief.
He underlined the need for timely completion of approved projects from previous years, underlining accountability and effective use of resources to meet consumer expectations.
Electricity rates in Pakistan increased by 268% between November 2010 and December 2023. The average invoices increased from RS9.2 to RS24.72 per kilowatt hour.
In view of this, Lahore Electric Supply (Lesco) has applied with the regulator for revision of warranties for consumers who wish to receive new electricity connections.
It reports a significant increase in average pricing rates over the last decade. The proposed changes are intended to better align security deposits with current billing trends and protection from the risk of consumer default.
According to the new proposal, security rates for all consumers, excluding urban home users, will be determined in two and a half months of average pricing.
For urban domestic consumers with real estate up to 10 Marlas, the guarantee requirement will increase to cover three months of billing. For properties exceeding 10 Marlas, the percentages will be linked to 1% of the value of the Earth, based on the Federal Revenue Council.
Lesco also requested amendment to existing rules to allow the deposit of consolidated reports of security deposits with annual revisions. This approach is expected to rationalize the process and ensure timely updates on deposit requirements.
The proposed revisions aim to deal with the vacuum, ensuring that security deposits cover adequately possible delays in the event of payment of payment. In the context of its policy in accordance with paragraph 5.1.1 of the Consumer Services Manual 2021, Lesco plans to issue demand notifications for security deposits with up -to -date prices, which will be deposited by applicants in the designated bank branches.
a href=”https://tribune.com.pk/story/2525128/mepcos-rs119b-investment-plan-receives-flak”>Source link



