Friday, November 6, 2026 · Petrol Rs 369.06 · USD/PKR 276.7522 · Gold Rs 426036/tola
Breaking
MPs Told to Declare Assets by 31 December or Be Suspended Trump and Qatar’s Emir Discuss Ending the Iran Crisis Turkish Parliament Ratifies the Makkah Defence Pact PSX Takes Back 175,000 in a Fourth Straight Advance State Bank Switches On a New Core Banking Network MQM-P Goes to Court Over Sindh Local Body Amendments Court Suspends All Peshawar High Court Cases Filed Since 12 October Arab States Condemn Houthi Missile Aimed at Madinah KP Police Ask for Another Rs25 Billion, Mostly for Counterterrorism Local Elections in Khyber Pakhtunkhwa Put on Hold Government Weighs a Three-Month Reprieve for 1.2 Million Traders NADRA Officer Shot Dead on His Way to Work in Peshawar Pumps Refusing Subsidised Fuel to Lose Their Licences Pakistan Cuts Petrol Price by Rs9.41, Diesel by Rs5.56 Per Litre Türkiye’s Parliament Ratifies Makkah Defence Pact with Pakistan and Saudi Arabia D-8 chief pushes trade and investment agenda at COMCEC session in Istanbul El-Sayed Becomes the First Muslim Elected to the US Senate FBR Chief Says the Super Tax Will Go Completely JIT Finds Backdated Deal and Illegal Flat Sales at Islamabad Towers New Court Stops the Peshawar High Court Hearing Detention Cases
Business

Diamer Basha dam progress reviewed

LAHORE:

WAPDA Chairman Engr Lt Gen Sajjad Ghani (Retd) reviewed the construction progress of Diamer Basha Dam project during a day-long visit, according to a press release issued on Thursday.

Diamer Basha Dam, at 272 meters high, is the tallest prestressed concrete (RCC) dam in the world. It is being built along the Indus River, 40 km downstream of the town of Chilas. Construction is currently underway at 17 key locations, with the project scheduled for completion in 2028, the statement said.

Ghani inspected the diversion tunnels, upstream and downstream dams, retaining wall, dam shaft and the recently completed permanent bridge. He also visited the materials testing laboratory. The visit was accompanied by WAPDA Member (Water), CEO of Diamer Basha Dam Company and senior officials of the project.

The site updates highlighted the satisfactory performance of the river diversion system during the high flow period, the ongoing excavation work at the dam abutments and the completion of the permanent access bridge downstream of the main dam.

Ghani urged consultants and contractors to speed up construction to meet project deadlines.

Diamer Basha Dam boasts of a gross water storage capacity of 8.1 million acre feet (MAF) and will irrigate 1.23 million acres of land. It will have a power generation capacity of 4,500 MW, contributing 18 billion units of electricity annually.

In the second part of his visit, the president held a Jirga with elders from Diamer and Upper Kohistan, accompanied by the GM (Land Acquisition and Resettlement) of WAPDA and the local civil administration. Discussions focused on WAPDA’s Confidence Building Measures (CBM) for resettlement, health, education and infrastructure development in the areas of Diamer Basha Dam and Dasu Hydropower Project.

WAPDA has allocated Rs 78.5 billion for development projects related to Diamer Basha Dam and Rs 17.35 billion for Dasu Hydropower Project. Ghani also emphasized that local employment opportunities are being prioritized in both projects.

a href=”https://tribune.com.pk/story/2493891/progress-on-diamer-basha-dam-reviewed”>Source link

Hamza Azhar SalamEditor — Hamza Azhar Salam · Write to us with suggestions or tips
Powered by: Frontpage.dev
WP Twitter Auto Publish Powered By : XYZScripts.com